|
OPTION W1: RE-SIGNALING |
|
|
| Description | With no changes to the track work re-signaling the route between Hatfield and Stevenage could be upgraded to allow for higher running speeds and smaller pathing timings. |
| Pros | No impact on the environment, Low cost. |
| Cons | Provides only minor capacity increase, No speed increase within the tunnels. |
| Summary | A low cost solution with very little benefit to capacity. |