OPTION W10: |
Description | Upgrade the existing Hertford Loop. |
Pros | Provides addition capacity but not enough. |
Cons | Costly and disruptive, Speed is very limited by existing track layout and slow local services. |
Summary | Costly way that does not solve the problem. |