Taken in April 1987 this shows how a railway can be run when Electric Multiple Units couple to locomotives, without the need for adaptor couplings, and life goes on pretty much as usual.
| | |
|
 | A 31 with the Hornsey OLE mainence train stands to the south of Hitchin station during the weekend drags on the GN. |
|
| | |
|
 | A 31 prepares to be detached from a 312 during the weekend drags on the GN. |
|
| | |
|
 | A class 31 stands in the loco point during the weekend drags on the GN |
|
| | |
|
 | 47407 heads north throuh Hitchin with an express during the weekend drags on the GN. |
|
| | |
|
 | A Permaquip trolley works on the line during the weekend drags on the GN |
|
| | |
|
 | A Permaquip trolley works on the line during the weekend drags on the GN |
|
| | |
|
 | A 31 stands on the Hornsey OLE Train just south of Hitchin during the weekend drags on the GN. |
|
| | |
|
 | 31219 waits at Welwyn Garden City for the next turn during the weekend drags on the GN. |
|
| | |
|
 | 31219 pauses at Knebworth with a 312 during the weekend drags on the GN |
|
| | |
|
 | 31219 heads north at Knebworth with a 312 during the weekend drags on the GN |
|